9619-v1 |
Far Site Waste Rock Handling Options - August 2014 |
Syd De Vries |
Director's CD-3A Review of LBNF
CF at Far Site
|
27 Jan 2016 |
2794-v23 |
Liquid Argon Detector drawings and illustrations |
Bruce Baller et al. |
LAr-TPC & Cold Elec & HV
LAr-Cryogenics & Purification
Director's Review Sept 2012
Liquid Argon Detector
LAr-Installation & Commissioning
CF at Far Site
DUSEL
|
14 Dec 2012 |
10692-v12 |
Volume 3, Annex 3B, Conventional Facilities (CF) at the Near Site |
Tom Hamernik et al. |
CD-1-R DOE Review
CF at Fermilab
CD-1-R Director's Review
|
04 Sep 2015 |
10691-v6 |
Vol 3, Annex 3C, Conventional Facilities (CF) at the Far Site |
Tracy Lundin et al. |
CD-1-R DOE Review
CF at Far Site
CD-1-R Director's Review
|
04 Sep 2015 |
34-v6 |
Report on the Depth Requirements for a Massive Detector at Homestake |
Milind Diwan |
Requirements
Physics
Conventional Facilities
DUSEL
|
02 Sep 2015 |
10689-v27 |
LBNF/DUNE CDR Volume 3: The Long-Baseline Neutrino Facility for DUNE |
Tom Hamernik et al. |
CDR
LAr-Cryogenics & Purification
CD-1-R DOE Review
Conventional Facilities
CD-1-R Director's Review
Beamline
|
31 Aug 2015 |
11378-v2 |
August 2015 Interface Workshop Willhite PPT |
Josh Willhite |
CF at Far Site
|
12 Aug 2015 |
11380-v1 |
LBNF Kicker Capacitor Specification -Preliminary- |
Luciano Elementi |
Project
Reviews
Magnets
CF at Fermilab
|
10 Aug 2015 |
11292-v1 |
Experimental Program at the Long-Baseline Neutrino Facility |
James Strait |
Near Detector Systems
Physics
Liquid Argon Detector
Conventional Facilities
Beamline
LBNE Collaboration
|
09 Jul 2015 |
11189-v2 |
Report from LBNF - June 2015 PAC talk |
Elaine McCluskey |
Project
LAr-Cryogenics & Purification
Conventional Facilities
Beamline
|
22 Jun 2015 |
11174-v1 |
LBNF-DUNE Fact Sheet |
Anne Heavey et al. |
NEPA-EA
Liquid Argon Detector
Conventional Facilities
Beamline
|
13 Jun 2015 |
10359-v2 |
Ross Shaft Utility Locations |
Syd De Vries |
CF at Far Site
|
19 Feb 2015 |
4623-v9 |
CDR Volume 5 - Conventional Facilities at the Near Site |
Tracy Lundin et al. |
DOE CD-1 Review
CDR
CF at Fermilab
|
07 Nov 2014 |
9539-v1 |
Spherical target update (final)_updated graphics |
Quynh Nguyen |
CF at Fermilab
|
29 Oct 2014 |
9547-v1 |
Spherical Array Target - Final report paper |
Quynh Nguyen |
Beam Simulation
Beam Simulation
CF at Fermilab
|
06 Sep 2014 |
8365-v2 |
LBNE Reconfiguration Steering Committee Report |
Author Non-LBNE |
Near Detector Systems
Liquid Argon Detector
Conventional Facilities
Beamline
|
06 Aug 2014 |
7617-v1 |
LBNE Conventional Facilities Design Updates Since CD-1 |
Tracy Lundin |
CDR
Conventional Facilities
|
02 Aug 2013 |
5017-v5 |
CDR Volume 6 -- Conventional Facilities at the Far Site |
Tracy Lundin |
DOE CD-1 Review
CDR
CF at Far Site
|
23 Oct 2012 |
5968-v24 |
LBNE Reconfiguration Engineering/Cost Working Group Final Report |
Jeff Appel et al. |
Near Detector Systems
Project
Project Management
Liquid Argon Detector
Conventional Facilities
Beamline
|
09 Aug 2012 |