Fermilab | LBNE | Graphics


This DocDB will be archived as of EOB Friday, Aug. 28, 2015, after which no changes or additions can be made to it. The documents will remain available for download and reference. The destination for all new documents and updates to existing documents for DUNE and LBNF is docs.dunescience.org.


LBNE Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Events ] [ List Topics ] [ Fermilab Documentation Templates ]

These documents on Neutrino Beam (WBS 1.2.3) (subtopic of Beamline) and sub-topics are available:
Showing documents with topic Neutrino Beam (WBS 1.2.3) on the most recent version. See documents with Neutrino Beam on any version.
(List events on Neutrino Beam (WBS 1.2.3))

LBNE-doc-# Title Author(s) Topic(s) Last Updated
11043-v1 New MARS Model of LBNE Absorber Yury I Eidelman Modeling
26 May 2015
6249-v1 Can the NUMI beam-line be further optimized for a lower-neutrino-energy spectrum? Mary Bishai et al. Project
Neutrino Beam
Beamline
22 Jul 2014
3151-v1 Conceptual Designs for a Wide-Band Low-Energy Neutrino Beam Target Mary Bishai et al. Target
28 Feb 2014
8523-v1 Strategy for Target & Horn for 1.2 MW beam Jim Hylen Horns
Target
Horn Power Supply
04 Feb 2014
8521-v1 Target R&D Patrick G. Hurh Target
04 Feb 2014
6414-v2 GEANT 4 GLoBeS Fluxes for Beam Reference Design Aug 2012 Mary Bishai Modeling
Beam Simulation
03 Jul 2013
7164-v1 FRIB overview presentations by the FRIB-MSU Exp Systems Mechanical Design Group Patrick G. Hurh Neutrino Beam
11 Apr 2013
7163-v1 HiRadMat Overview, Status and Plans (at CERN) Patrick G. Hurh Neutrino Beam
11 Apr 2013
7162-v1 Overview of current target (and associated) activities at CERN Patrick G. Hurh Neutrino Beam
11 Apr 2013
7161-v1 CENF: CERN Neutrino Facility Patrick G. Hurh Neutrino Beam
11 Apr 2013
6151-v1 NuMI Hadron Monitor Drawings Author Non-LBNE Neutrino Beam
23 Jul 2012
2618-v1 LBNE AH RAW Presentation Karl Williams RAW Systems
Water Systems
Decay Pipe
Absorber
08 Sep 2010
3244-v1 HEAT LOAD IN COOLING PANELS AND SCALING DOSE RATES N. Mokhov Target Hall Shield Pile
15 Dec 2010

Number of documents found: 13

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Events ] [ List Topics ] [ Fermilab Documentation Templates ]


DocDB Version 8.8.9, contact LBNE Document Database Administrators
Execution time: 10 wallclock secs ( 1.26 usr + 0.56 sys = 1.82 CPU)