Fermilab | LBNE | Graphics


This DocDB will be archived as of EOB Friday, Aug. 28, 2015, after which no changes or additions can be made to it. The documents will remain available for download and reference. The destination for all new documents and updates to existing documents for DUNE and LBNF is docs.dunescience.org.


LBNE Document List by Topic

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Events ] [ List Topics ] [ Fermilab Documentation Templates ]

These documents on Conventional Facilities (WBS 1.6) and sub-topics are available:
Showing documents with topic Conventional Facilities (WBS 1.6) on the most recent version. See documents with Conventional Facilities on any version.

LBNE-doc-# Title Author(s) Topic(s) Last Updated
9619-v1 Far Site Waste Rock Handling Options - August 2014 Syd De Vries Director's CD-3A Review of LBNF
CF at Far Site
27 Jan 2016
2794-v23 Liquid Argon Detector drawings and illustrations Bruce Baller et al. LAr-TPC & Cold Elec & HV
LAr-Cryogenics & Purification
Director's Review Sept 2012
Liquid Argon Detector
LAr-Installation & Commissioning
CF at Far Site
DUSEL
14 Dec 2012
10692-v12 Volume 3, Annex 3B, Conventional Facilities (CF) at the Near Site Tom Hamernik et al. CD-1-R DOE Review
CF at Fermilab
CD-1-R Director's Review
04 Sep 2015
10691-v6 Vol 3, Annex 3C, Conventional Facilities (CF) at the Far Site Tracy Lundin et al. CD-1-R DOE Review
CF at Far Site
CD-1-R Director's Review
04 Sep 2015
34-v6 Report on the Depth Requirements for a Massive Detector at Homestake Milind Diwan Requirements
Physics
Conventional Facilities
DUSEL
02 Sep 2015
10689-v27 LBNF/DUNE CDR Volume 3: The Long-Baseline Neutrino Facility for DUNE Tom Hamernik et al. CDR
LAr-Cryogenics & Purification
CD-1-R DOE Review
Conventional Facilities
CD-1-R Director's Review
Beamline
31 Aug 2015
11378-v2 August 2015 Interface Workshop Willhite PPT Josh Willhite CF at Far Site
12 Aug 2015
11380-v1 LBNF Kicker Capacitor Specification -Preliminary- Luciano Elementi Project
Reviews
Magnets
CF at Fermilab
10 Aug 2015
11292-v1 Experimental Program at the Long-Baseline Neutrino Facility James Strait Near Detector Systems
Physics
Liquid Argon Detector
Conventional Facilities
Beamline
LBNE Collaboration
09 Jul 2015
11189-v2 Report from LBNF - June 2015 PAC talk Elaine McCluskey Project
LAr-Cryogenics & Purification
Conventional Facilities
Beamline
22 Jun 2015
11174-v1 LBNF-DUNE Fact Sheet Anne Heavey et al. NEPA-EA
Liquid Argon Detector
Conventional Facilities
Beamline
13 Jun 2015
10359-v2 Ross Shaft Utility Locations Syd De Vries CF at Far Site
19 Feb 2015
4623-v9 CDR Volume 5 - Conventional Facilities at the Near Site Tracy Lundin et al. DOE CD-1 Review
CDR
CF at Fermilab
07 Nov 2014
9539-v1 Spherical target update (final)_updated graphics Quynh Nguyen CF at Fermilab
29 Oct 2014
9547-v1 Spherical Array Target - Final report paper Quynh Nguyen Beam Simulation
Beam Simulation
CF at Fermilab
06 Sep 2014
8365-v2 LBNE Reconfiguration Steering Committee Report Author Non-LBNE Near Detector Systems
Liquid Argon Detector
Conventional Facilities
Beamline
06 Aug 2014
7617-v1 LBNE Conventional Facilities Design Updates Since CD-1 Tracy Lundin CDR
Conventional Facilities
02 Aug 2013
5017-v5 CDR Volume 6 -- Conventional Facilities at the Far Site Tracy Lundin DOE CD-1 Review
CDR
CF at Far Site
23 Oct 2012
5968-v24 LBNE Reconfiguration Engineering/Cost Working Group Final Report Jeff Appel et al. Near Detector Systems
Project
Project Management
Liquid Argon Detector
Conventional Facilities
Beamline
09 Aug 2012

Number of documents found: 19

DocDB Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Events ] [ List Topics ] [ Fermilab Documentation Templates ]


DocDB Version 8.8.9, contact LBNE Document Database Administrators
Execution time: 13 wallclock secs ( 2.15 usr + 0.91 sys = 3.06 CPU)